rsz_1dscf0381-300x224 Humboldt, Iowa  -  Fall 2009rsz_dscf0422-300x224 Humboldt, Iowa  -  Fall 2009

 

 

 

 

 

 

rsz_dscf0429-300x224 Humboldt, Iowa  -  Fall 2009rsz_dscf0441-300x224 Humboldt, Iowa  -  Fall 2009

 

 

 

 

 

 

 

 

In the fall of 2009, Fischer Bros  outlasted the rain to complete a major maintenance project at this attractive Midwest waterpark.  Leaks were repaired, all seams recaulked, and several major fiberglass repairs were completed, along with painting of steel structure components and some hardware replacement.  Both slides required complete seam realignment, as the ride quality left a lot to be desired.  Both slides were also showing substantial fading, so they were completely buffed to return the original luster.  A small fiberglass themed kiddie slide onsite was also restored.